Opening a restaurant: why exhaust, 3-phase power and water matter
Renting a shop for a restaurant in KL or Selangor? Check exhaust routing, 3-phase power, water inlet, drainage and grease trap first. A practical checklist.
Short answer
For a restaurant, the exhaust route, 3-phase power and water points decide whether the shop can work as a kitchen. If the exhaust cannot be routed cleanly, the power cannot carry your equipment or the drainage is in the wrong place, you face high costs, delays or complaints. Check all three before you sign.
Why do these services matter more than the shopfront?
A beautiful frontage with no exhaust route is not a restaurant site. Landlords often advertise F&B-ready units for this reason, and takeover adverts for F&B shops in Malaysia ask RM 68,000 to RM 80,000 in goodwill partly because the kitchen services are already in place. Getting these wrong can push your opening back by months.
The restaurant services checklist
| Service | What to check | Why it matters |
|---|---|---|
| Kitchen exhaust | Route to back lane or roof, distance, who lives or works nearby | Smoke and smell complaints from neighbours |
| Power supply | Single phase or 3-phase, meter rating, distance to substation | Commercial stoves, chillers and air conditioning need capacity |
| Water inlet | Pipe size, position, meter | Dishwashing, prep and cleaning need steady supply |
| Floor traps and drainage | Number, location, fall to back lane | Kitchen floors need to drain quickly |
| Grease trap | Existing or space to install | Usually required for food premises |
| Gas | Piped gas or cylinder storage space | Safety and fire rules |
| Back lane access | Deliveries, bins, staff entrance | Smooth operations and hygiene |
| Fire safety | Exits, extinguishers, hood suppression where needed | Licensing and insurance |
How do you check the exhaust route?
- Walk to the back lane and look for existing ducts on the wall or roof of the unit.
- Ask how previous F&B tenants vented, and whether there were complaints.
- Check who occupies the neighbouring units. Residential or office tenants next to a ground-floor kitchen are the usual source of complaints.
- Ask the landlord in writing whether you may install a duct through the roof or along the rear wall.
- Ask your contractor for the duct length and fan size before committing.
What about 3-phase power?
Most heavy kitchen equipment, large chillers and commercial air conditioning are designed for 3-phase supply. Check the meter board. If the unit has single phase only, ask:
- whether the landlord will apply for an upgrade, and who pays
- how long the utility upgrade is likely to take
- whether the rent-free period covers the wait
Put the answer in the tenancy agreement, not in a WhatsApp message.
What about water points and drainage?
Plan the kitchen layout around the existing water inlet and floor traps where you can. Moving drainage in a ground-floor slab means hacking the floor, which adds cost and time. Check the fall of the drains to the back lane and ask whether the unit has flooded before. Neighbouring shopkeepers usually know.
Which hubs suit restaurants?
Food streets and dense residential hubs where F&B has proven demand. Based on MCE analysis of portal adverts from the last six months (Nov 2026, shop units only, duplicate and bait adverts removed, middle half of asking prices):
| Hub | Typical asking rent per month |
|---|---|
| Jalan Alor | RM 15,000 to RM 26,000 |
| Changkat Bukit Bintang | RM 15,000 to RM 30,000 |
| Sri Petaling | Very wide spread (whole buildings mixed in), ask MCE |
| Taman OUG | RM 5,000 to RM 13,000 |
| Kepong Baru | RM 5,800 to RM 9,000 |
What should go into the tenancy agreement?
- Approved use as a restaurant or food premises
- Landlord permission for the exhaust route, roof works and signage
- Who pays for a power upgrade and grease trap
- A rent-free fit-out period that starts at handover
- Reinstatement rules, because removing ducts and kitchens at the end costs money
Our tenancy clauses checklist covers each of these. If a unit is a takeover, use this list before agreeing any goodwill, as in our goodwill guide.
Practical tips
- Bring your kitchen contractor to the second viewing, not after signing.
- Visit at 7pm on a weekday to see how neighbouring restaurants trade and vent.
- Photograph the meter board, the back lane and the roof access.
Browse ground-floor shops and corner lots or contact us for F&B-ready units.
Written by Tok Ginstee (REN 37505), CID Realtors Sdn Bhd (E (1) 1855). Updated November 2026.
Frequently asked questions
Does a restaurant need 3-phase power in Malaysia?
Can I run a kitchen exhaust through the roof of a shoplot?
Is a grease trap required for a restaurant shop?
Is it cheaper to take over an existing restaurant shop?
The best shops in prime hubs never go online
Every shop and price on this site is a market range, so you know what an area costs. Prime ground-floor units in busy hubs are usually let or sold quietly, before any banner or portal advert, and we offer them first to people who have already told us what they need. If you want to rent, buy or sell in a prime area, WhatsApp us your area, size, budget and trade, and we will send matching units as soon as they come up.
Free location advice: Not sure where your brand fits? Tell us your trade, target customers and budget, and we will recommend the hubs and streets that suit you best, free of charge.
Free location adviceWhy work with MCE:for tenantsfor buyers and investorsfor landlords
More insights
How big is a ground-floor shop? 22x75, mezzanine and half units
What 22x75 means, typical ground-floor sizes in KL and Selangor hubs, and whether a mezzanine, half unit or wider frontage is worth it.
Why are prime shop lots in KL and Selangor almost never vacant?
KL had only 10 unsold completed shops in 2025. Why ground floors in mature hubs re-let quietly, and what makes even a prime row go empty.
How do you tell if a shop location is good? (15-point checklist)
A 15-point on-site checklist for judging a ground-floor shop in KL and Selangor: footfall, frontage, anchors, parking, services and vacancy signals.